Legacy Resort
Client: Sable Resorts Development Ltd.
Location: Sicamous, BC
Project: Construction of condominium resort, a marina and a hydrothermal heating system
Services: Landscape Design, Environmental Permitting and Monitoring
Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. The development is situated adjacent to, and within 30 meters of, Mara Lake and Gilles Brook and is therefore subject to the Riparian Areas Regulation (RAR) and other environmental legislation. Melony prepared environmental management prescriptions, a detailed riparian restoration plan and monitored stages of the development, including directional drilling for the hydrothermal system. Melony liaised with regulatory agencies and First Nations, and assisted her client obtain environmental permits, including a Section 9 Water Act Approval and a Canadian Environmental Assessment Act (CEAA) Review.
Mill Creek Rail Bridge Crossing
Client: Action Metals
Location: Kelowna, BC
Project: Rail Bridge Construction
Services: Environmental Monitoring and Reporting
Melony Catana, AScT worked on this project while she was employed at EBA Engineering Consultants Ltd. Melony monitored riparian restoration, fish habitat creation, and the installation of a steel and concrete rail bridge over Mill Creek.
Predator Ridge
Client: Predator Ridge Resort
Location: Vernon, BC
Project: Golf Course Renovation and Residential Community Development
Services: Environmental Planning, Section 9 and Riparian Areas Regulation (RAR) Permitting, Landscape Restoration Design
Elevate principal, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. Melony was the project manager of environmental services provided to Predator from 2008-2009. She prepared and/or supervised the preparation Section 9 Applications, for renovation projects on the golf course. She conducted a RAR Assessment for the golf course and residential development, adjacent to Birdie Lake, and prepared detailed riparian and aquatic habitat designs.
District of Houston Leisure Centre Geoexchange
Client: District of Houston
Location: Houston, BC
Project: Construction of Geoexchange System at the Community Leisure Centre
Services: Environmental Assessment, Monitoring and Reporting
Elevate CEO, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. This project involved directional drilling adjacent to a river in order to install geothermal lines. Melony prepared a construction environmental management plan for the project, conducted environmental monitoring during line installation, liaised with regulators and prepared reports and documentation that was requested by the Western Economic Diversification Canada.
Port Mann Water Supply Tunnel
Client: McNally AECON Joint Venture
Location: Vancouver, BC
Project: Port Mann Tunnel Boring and Water Supply Pipe Installation
Services: Environmental Management
Elevate CEO, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. This project involved tunnel boring under the Fraser River, from Surrey to Coquitlam. Melony worked with a team to prepare the construction environmental management plan. She also prepared a sediment and erosion control plan in coordination with a civil engineer.
Kestrel Place
Client: Vineyard Developments Ltd.
Location: Vernon, BC
Project: Development of a Residential Lake-front Property
Services: Environmental Monitoring and Reporting
Elevate has been retained to provide environmental monitoring and reporting services. The project involves construction on a steep lot and highly constrained water-front lot. The project is ongoing.
Barona Beach
Location: West Kelowna, BC
Project: Shoreline Erosion Protection and Habitat Restoration
Services: Environmental Permitting and Monitoring
Barona Beach contacted Elevate for assistance with an erosion problem along the Okanagan Lake shoreline of their property. An unprotected portion of the shoreline was being eroded by wave action and there were concerns that a nearby building would be impacted. Melony Catana coordinated the services of a geotechnical engineer to assist her with the development of a restoration plan, which included a retaining wall and a riparian restoration landscape plan. Melony also prepared a Section 9 Application and assisted with the preparation of a Development Permit Application to the District of West Kelowna. Both permits were successful. On The Mark was the contractor hired to do the work. The work involved construction of a lock block retaining wall, access paths, rock stairs and native landscape vegetation. The work was successfully completed in spring of 2013.
Sheerwater
Client: Various
Location: Kelowna, BC
Project: Development of Residential Lots – 1, 4, 10/11/12, 13, & 19
Services: Environmental Assessment, Monitoring, Permitting, Design
Principal of Elevate, Melony Catana, AScT, was involved with these projects while she worked at EBA Engineering Consultants Ltd. Development at the Sheerwater Community has been ongoing since 2005. Melony has participated in providing environmental services at various stages and for several clients at Sheerwater. Services included: environmental assessment, environmental management planning, erosion and sediment control design, landscape design, hazard tree assessment, and environmental monitoring.
Peachland Restoration
Client: Doug Nuytten, Owner
Location: Peachland, BC
Project: Emergency Riparian Restoration
Services: Riparian Areas Regulation (RAR) Assessment, Landscape Restoration Design, Environmental Monitoring
Principal of Elevate, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. Extensive unauthorized site clearing and earthworks was done in the steep riparian area of the property and a stop-work order was issued by the District of Peachland. Melony assisted the homeowner by liaising with regulatory agencies, geotechnical engineers and concerned stakeholders, to determine a course of action that would rectify the situation, satisfy regulatory, geotechnical safety requirements, and ease neighbour’s concerns. Melony then completed a RAR Assessment, prepared a detailed landscape restoration plan, attended a council meeting, liaised with the landscape contractor and monitored construction. The project was a great success in that regulatory permits were obtained in enough time to conduct the restoration on-time and to the satisfaction of the client and stakeholders. Follow-up monitoring indicates that the restoration plants have been successful.
Bear Creek
Client: Regional District of Central Okanagan
Location: Kelowna, BC
Project: Boat Launch Removal and Habitat Restoration
Services: Environmental Monitoring and Reporting
Principal of Elevate, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. Melony conducted fish exclusion/salvage operations and monitored the removal of a boat launch, re-grading of the beach and installation of riparian restoration landscaping.