• Home
  • About
  • Projects
  • Associates
  • Contact

Legacy Resort

The Legacy

Client: Sable Resorts Development Ltd.

Location: Sicamous, BC

Project: Construction of condominium resort, a marina and a hydrothermal heating system

Services:  Landscape Design, Environmental Permitting and Monitoring

Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd.  The development is situated adjacent to, and within 30 meters of, Mara Lake and Gilles Brook and is therefore subject to the Riparian Areas Regulation (RAR) and other environmental legislation. Melony prepared environmental management prescriptions, a detailed riparian restoration plan and monitored stages of the development, including directional drilling for the hydrothermal system. Melony liaised with regulatory agencies and First Nations, and assisted her client obtain environmental permits, including a Section 9 Water Act Approval and a Canadian Environmental Assessment Act (CEAA) Review.

Predator Ridge

Predator Ridge

Client: Predator Ridge Resort

Location: Vernon, BC

Project: Golf Course Renovation and Residential Community Development

Services:  Environmental Planning, Section 9 and Riparian Areas Regulation (RAR) Permitting, Landscape Restoration Design

Elevate principal, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd.  Melony was the project manager of environmental services provided to Predator from 2008-2009.  She prepared and/or supervised the preparation Section 9 Applications, for renovation projects on the golf course.  She conducted a RAR Assessment for the golf course and residential development, adjacent to Birdie Lake, and prepared detailed riparian and aquatic habitat designs.

Barona Beach

Barona Beach

Client: Barona Beach Resort Strata

Location: West Kelowna, BC

Project: Shoreline Erosion Protection and Habitat Restoration

Services:  Environmental Permitting and Monitoring

Principal of Elevate, Melony Catana managed this project while working at EBA Engineering Consultants Ltd.  Barona Beach contacted Melony for assistance with an erosion problem along the Okanagan Lake shoreline of their property.  Because the grade of the property was brought up significantly during development of the property, an unprotected portion of the shoreline was being eroded wave action.  Melony coordinated the services of a geotechnical engineer to assist her with the development of a restoration plan, which included a retaining wall and a riparian restoration landscape plan.  Melony also prepared a Section 9 application and assisted with the preparation of a Development Permit Application to the District of West Kelowna.  Both permits have been successful and work is planned for fall of 2012.

Sheerwater

Sheerwater

Client: Various

Location: Kelowna, BC

Project: Development of Residential Lots – 1, 4, 10/11/12, 13, & 19

Services:  Environmental Assessment, Monitoring, Permitting, Design

Principal of Elevate, Melony Catana, AScT, was involved with these projects while she worked at EBA Engineering Consultants Ltd. Development at the Sheerwater Community has been ongoing since 2005.   Melony has participated in providing environmental services at various stages and for several clients at Sheerwater. Services included:  environmental assessment, environmental management planning, erosion and sediment control design, landscape design, hazard tree assessment, and environmental monitoring.

Peachland Restoration

Peachland Steep Slope Riparian Restoration

Client: Doug Nuytten, Owner

Location: Peachland, BC

Project: Emergency Riparian Restoration

Services:  Riparian Areas Regulation (RAR) Assessment, Landscape Restoration Design, Environmental Monitoring

Principal of Elevate, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd. Extensive unauthorized site clearing and earthworks was done in the steep riparian area of the property and a stop-work order was issued by the District of Peachland.  Melony assisted the homeowner by liaising with regulatory agencies, geotechnical engineers and concerned stakeholders, to determine a course of action that would rectify the situation, satisfy regulatory, geotechnical safety requirements, and ease neighbour’s concerns.  Melony then completed a RAR Assessment, prepared a detailed landscape restoration plan,  attended a council meeting, liaised with the landscape contractor and monitored construction.  The project was a great success in that regulatory permits were obtained in enough time to conduct the restoration on-time and to the satisfaction of the client and stakeholders.  Follow-up monitoring indicates that the restoration plants have been successful.

 

Bear Creek

Bear Creek Boat Launch Removal

Client: Regional District of Central Okanagan

Location: Kelowna, BC

Project: Boat Launch Removal and Habitat Restoration

Services:  Environmental Monitoring and Reporting

Principal of Elevate, Melony Catana, AScT, worked on this project while she was employed at EBA Engineering Consultants Ltd.  Melony conducted fish exclusion/salvage operations and monitored the removal of a boat launch, re-grading of the beach and installation of riparian restoration landscaping.

Contact Details

Elevate Environmental Inc.
Kelowna, British Columbia

Phone: 1.778.753.1491

Office Hours: Monday to Friday, 8:00 a.m to 5:00 p.m.

Search

Search
Visit Us On TwitterVisit Us On Facebook